能夠提高油藏管理水平的智能完井技術(英)


標簽: 油藏管理 完井 


[ 時間:2009-02-19 全球石油網 關注度:2599217 ] [ 加入收藏 ] [ 字號: ]

簡介:進行智能完井能夠提高油藏管理水平,由于采用了一系列新技術,現在可以進行的監測內容遠多于壓力和溫度。

First conceived as alternatives to costly or technically difficult interventions, intelligent wells that can be monitored and controlled remotely have evolved into a powerful reservoir management tool. As a result, after initially slow industry-wide uptake, their number is projected to increase fivefold in the next five years. 


At the heart of intelligent wells are surface-actuated downhole valves, used to regulate flow from individual zones or laterals, and permanent downhole temperature and pressure sensors. Today, downhole control valves range from those with simple on-off controls to hydraulically actuated and electrically controlled, infinitely variable-setting chokes. These innovations permit engineers to design valves that can be remotely adjusted within a range of cross-sectional flow areas matched to a zone’s production profile. Schlumberger now reports a 97% reliability rate for its second-generation valves.

While the initial objective of intelligent well technology?extending well life?was effective, that was not the most efficient use of the technology. Instead, the technology’s true promise, the industry has come to understand, is best realized when intelligent wells are used as a tool for maximizing reserves recovery. This change in intelligent well identity ? from intervention avoidance to reservoir management tool ? has been greatly enhanced by the emergence of robust downhole permanent pressure and temperature sensors capable of functioning in harsh environments for extended periods of time. Their new role has also been furthered by increased longevity, the result of more reliable electrical connections that in the past had been a weak link in downhole electronics. Today, fully redundant, independently testable, mechanical and full-welded connectors and splices have delivered a step-change improvement in reliability.

Because of these new technologies, monitoring today includes much more than pressure and temperature data. Permanent downhole multiphase flowmeters, seismic sensors, and electrodes have been included to deliver formation imaging away from the well bore, and they are all being connected through control centers that facilitate almost instantaneous responses to changing conditions. Data from these intelligent completions are also used to continually enhance and update production models and simulations, perform and interpret production tests on individual zones and laterals, predict sand and water encroachment, and measure flow rate and water cut.

Smart choice

The advantages of reservoir monitoring and control are obvious. For example, since wells seldom cross only a single hydrocarbon-bearing zone, completion engineers are often forced to decide between commingling production from multiple zones and producing each zone sequentially. Historically, producing more than one zone at a time has been an option only when the zones are of compatible pressure and fluid composition, and no regulatory concerns exist. Two, three, and sometimes four perforated intervals also can be produced at the same time through completions in which each zone is mechanically isolated from the others and flowed to the surface through separate production strings.

Sequential production typically requires flowing one zone to its economic limit before plugging and abandoning it in order to move up the hole to complete the next zone.

This cycle is then repeated until all zones have been depleted. In almost all cases, this strategy leaves behind considerable reserves and results in poor production profiles because of extended periods of depletion within each zone.

In contrast, using intelligent completions in a sequential production scheme, which involves opening and closing each zone remotely from the surface, improves production by eliminating both intervention costs and poor production profiles. Variable-setting valves can also be used to eliminate sequential production in favor of commingling by managing flow from high-pressure zones to prevent crossflow.

This does not mean that intelligent completion technology guarantees added value wherever it is applied. Experience has shown that the degree to which production is improved by intelligent completions depends on such factors as porosity and permeability distribution within that reservoir. The decision to use intelligent wells does not require every well in a smart field to be an intelligent completion. The operator must first ascertain that the reservoir type in a given field is suitable for intelligent well technology and then make a similar determination for each well planned for the field.

Candidate screening processes range from a simple analytical approach to complex reservoir models. Given such inherent uncertainties as reservoir characteristics, produced fluid composition, well performance, and recovery efficiency, it is important to use a stochastic rather than deterministic approach in the screening process.

Guiding parameters

General experience-based guides for choosing an intelligent well strategy have emerged over time. In a reservoir with uniform permeability, for instance, remotely actuated valves would seem, at first glance, to be an effective tool for managing water influx and therefore increasing well life and ultimate recovery. But if the completion is to be set across a relatively short interval within that reservoir, an intelligent completion may not be economically justified since a sufficiently uneven fluid front may not develop. In other words, the oil and water streams may not be sufficiently distinct to allow control of one fluid flow stream without affecting the other, and an intelligent completion would be a waste of money.

While intelligent completions can be effective in layered reservoirs, for obvious reasons they are decidedly more efficient when the shale zone separating the sands is continuous and the seal impermeable. Therefore, within the same layered reservoir, some wells crossing reliably sealed layers are well-served by intelligent completions.

One set of mathematical models developed for candidate screening uses reservoir simulation and well simulation techniques to generate a comparative model of the benefits of intelligent completions. Scenarios are created to generate variance in reservoir performance affecting the timing of events requiring intervention, reservoir monitoring, or reservoir management and are often driven by geological uncertainty and reservoir heterogeneity.

In heterogeneous channel reservoirs, the benefits of intelligent completions depend on well performance, which, in turn, depends on well placement with respect to the permeability of the formation and connectivity of the channels. That is because the effectiveness of flow control valves depends on choking, which is a function of high deliverability. By their nature, however, the majority of heterogeneous reservoirs benefit from intelligent completions since their varying permeability and porosity tend to create just the kind of fluid front that variable-setting valves can best exploit.

Team effort in Saudi Arabia

In 2004, Saudi Aramco engineers drilled and completed a maximum reservoir contact (MRC) well as a proof-of-concept project. The well is in the Haradh field, the designation given the southwest portion of Saudi Arabia’s giant Ghawar field. The Haradh area was brought on production in three successive increments over nearly 10 years from May 1996 to January 2006. While Increment I was developed using conventional completions wells, experience led Saudi Aramco engineers to eventually include MRC, multi-laterals, and intelligent completions in final Increments II and III.

The A12 well in the Haradh area was originally completed from a horizontally set, 7-in. line. A 61⁄2-in. horizontal openhole section was then drilled from the bottom of the liner and a 41⁄2-in. liner set across a section that had incurred heavy fluid losses during drilling of the main well bore. Two more 61⁄2-in. laterals were drilled from the 7-in. liner and left as “barefoot,” or openhole, completions.

With this standard multilateral completion, no water was produced initially, but in less than one year, water cut had reached about 23%. As a result, available drawdown and overall production were reduced and treatment and disposal costs rose, prompting the operator to deem water-production control imperative.

In response, Schlumberger designed and deployed an intelligent completion system with multiposition, downhole flow control valves and surface flow-rate measurements to selectively manage water production from each of the three zones. Through optimization of the downhole control valves, water cut was reduced from 23% to almost zero.

The successful application of intelligent wells to the Haradh field, as detailed in a paper presented at the 2007 International Petroleum Technology Conference, held in Dubai, was the result of a project-management approach to the design, planning and installation processes. Five Schlumberger segments teamed with the Saudi Aramco facilities, production, drilling and workover; reservoir management; and reservoir description departments. Schlumberger and Saudi Aramco’s reservoir management and reservoir description departments built a multilateral well model in PIPESEM production system analysis software to calculate pressures opposite each lateral at various water cuts. The simulation estimated lateral performance across the valves over a range of pressure and flow rates.

Prior to starting the project, more than 30 multidisciplinary team members from Schlumberger and Saudi Aramco participated in a two-day forum to plan the project, run the completion on paper, agree on the design criteria and running procedures, and define responsibilities. Participants jointly developed a list of 28 action items in an effort to ensure a trouble-free operation.

The field team consisted of a completions installation crew, a reservoir evaluation wireline crew, a coiled tubing crew, and a multiphase flow testing crew managed through the Schlumberger advanced completions project manager. In view of the well’s workover history and the possible presence of casing deformations capable of affecting intelligent completion installation, the reservoir evaluation wireline and well services segments ran a USI UltraSonic Imager corrosion log on coiled tubing. The run confirmed the integrity of the casing and the suitability of QUANTUM gravel pack and MultiPort bypass packers with multiple porting. Using a PhaseTester portable multiphase well production monitoring system and the InterACT real-time monitoring and data delivery system, the team optimized the intelligent completion performance. This enabled the

Saudi Aramco engineers at their offices in town to adjust downhole flow-control valve settings in real time to maximize oil production and minimize water cut. 

During equipment testing and installation, and subsequent flow testing of the well, each of the valves was actuated through more than 10 complete cycles?110 position changes, or the equivalent of several years of typical operation. The well was fully flow-tested and put on production with minimal water production. Saudi Aramco engineers reported at the 2007 IPTC meeting that without the intelligent well approach, the well would have watered out and ceased production.

Tubing- and wireline-retrievable flow control valves. These intelligent flow control valves, unlike their predecessors, do not require wireline or coiled tubing intervention to close, open, or infinitely adjust the flow area. Instead, they are remotely actuated through a hydraulic capillary tube (left) or, in the case of the electrical systems, through an electrical signal to electromechanical actuators (right). Both valves shown are tubing-retrievable.
相關技術裝備
2011-03-03 16:49:45 ·“膨脹套管完井修井關鍵技術”獲一等獎
2010-12-29 10:55:22 ·勝利灘淺海無污染鉆完井液技術通過山東省成果鑒定
2010-08-04 14:21:27 ·冀東油田南堡43-X4806井完井
2010-07-07 10:10:47 ·勝利油田首次成功應用海上旋轉尾管完井技術
2010-06-28 16:28:40 ·国产精品婷婷午夜在线观看 _国产精品亚洲自拍_天天综合日日夜夜精品 _蜜桃免费网站一区二区三区_都市激情国产精品_亚洲国产精品一区二区第四页av _heyzo一区
国产河南妇女毛片精品久久久| 日韩在线一区二区| 久久久亚洲欧洲日产国码αv| 国产亚洲一区字幕| 亚洲欧美视频一区| 亚洲成人av一区| 久久99精品国产麻豆婷婷| 国产98色在线|日韩| 91久久精品一区二区| 日韩天堂在线观看| 亚洲欧洲日韩在线| 亚瑟在线精品视频| 激情文学综合丁香| 色婷婷综合久久久久中文一区二区 | 亚洲国产精品激情在线观看| 一区二区不卡在线视频 午夜欧美不卡在 | 91成人国产精品| 精品日韩99亚洲| 亚洲另类在线一区| 久久99蜜桃精品| 91亚洲精品久久久蜜桃| 日韩片之四级片| 亚洲免费高清视频在线| 久久精品国产77777蜜臀| 91一区一区三区| 久久综合九色综合欧美亚洲| 亚洲一区二区成人在线观看| 国产美女一区二区三区| 国产欧美日韩视频在线观看| 亚洲精品国产一区二区精华液| 美日韩黄色大片| 色网综合在线观看| 欧美国产乱子伦| 日韩精品成人一区二区在线| 91免费在线播放| 久久综合久色欧美综合狠狠| 午夜精品久久久久久久| 99国产精品久久久久久久久久| 欧美成人vr18sexvr| 一区二区三区中文字幕精品精品 | 欧美福利视频导航| 亚洲天堂中文字幕| 国产综合色产在线精品| 4438x成人网最大色成网站| 亚洲视频精选在线| 国产精品资源在线观看| 欧美一区二区成人| 亚洲自拍都市欧美小说| 成人av电影免费观看| 久久久久免费观看| 日韩av一区二区在线影视| 色猫猫国产区一区二在线视频| 国产丝袜在线精品| 狠狠色狠狠色综合日日91app| 欧美日韩综合色| 樱花影视一区二区| youjizz久久| 国产拍欧美日韩视频二区| 麻豆国产精品一区二区三区 | 久久se精品一区二区| 欧美另类高清zo欧美| 亚洲人123区| 成人免费视频播放| 久久久久久久久久久久电影 | 亚洲精品第一国产综合野| 成人免费观看av| 国产清纯白嫩初高生在线观看91| 久久国产婷婷国产香蕉| 日韩一区二区三区电影在线观看| 丝袜亚洲另类丝袜在线| 欧美日韩大陆一区二区| 一区二区三区不卡在线观看| 成人精品国产福利| 国产日韩欧美高清| 成人小视频在线| 日韩不卡一二三区| 欧美性色黄大片| 亚洲成av人片在线观看| 欧美在线视频全部完| 亚洲综合在线第一页| 91福利在线导航| 亚洲精品国产精品乱码不99| 色综合久久66| 亚洲精品视频在线| 91精彩视频在线观看| 亚洲最新在线观看| 日本精品一级二级| 亚洲福中文字幕伊人影院| 欧美揉bbbbb揉bbbbb| 午夜私人影院久久久久| 制服丝袜国产精品| 捆绑变态av一区二区三区| 日韩欧美国产成人一区二区| 久久精品国产澳门| 久久一夜天堂av一区二区三区| 久久99国产精品久久99果冻传媒| 精品国产成人系列| 国产a级毛片一区| 国产精品久久久久aaaa樱花| www.欧美精品一二区| 亚洲欧美日本在线| 9191成人精品久久| 麻豆91在线播放| 国产亚洲va综合人人澡精品 | 欧美va日韩va| 国产成人亚洲综合色影视| 国产精品美女久久久久高潮| 91一区在线观看| 丝袜亚洲另类欧美综合| 久久综合久久综合久久| 成人成人成人在线视频| 亚洲欧美另类在线| 欧美日产国产精品| 经典三级在线一区| 中文字幕av一区 二区| 欧美视频一区二区三区在线观看| 琪琪久久久久日韩精品| 久久久五月婷婷| 91麻豆123| 日本少妇一区二区| 中文字幕巨乱亚洲| 欧美视频一区二区三区| 精品一区二区国语对白| 国产精品久久久久久久浪潮网站 | 日韩电影在线观看电影| 久久中文字幕电影| 色综合久久久久网| 久久精品久久精品| 中文字幕一区二区不卡| 欧美视频精品在线观看| 精品亚洲国内自在自线福利| 欧美国产欧美综合| 亚洲日本在线视频观看| 欧美一区二区三区四区高清 | 欧美色偷偷大香| 韩国av一区二区三区在线观看| 成人欧美一区二区三区视频网页 | 国产成人综合自拍| 一区二区国产视频| 久久综合久久久久88| 欧美在线观看禁18| 国产成人精品三级麻豆| 天天综合网天天综合色| 中文字幕国产精品一区二区| 欧美肥妇free| 99久久免费精品| 热久久久久久久| 亚洲人成影院在线观看| 精品免费视频.| 在线免费观看成人短视频| 国产在线看一区| 亚洲午夜视频在线观看| 国产农村妇女毛片精品久久麻豆 | 国产精品久久二区二区| 日韩色视频在线观看| 91久久精品午夜一区二区| 国产福利一区二区三区在线视频| 亚洲18色成人| 亚洲欧洲综合另类| 久久久久88色偷偷免费| 欧美美女喷水视频| 97成人超碰视| 国产麻豆精品在线观看| 午夜精品福利一区二区三区蜜桃| 中文字幕在线不卡一区二区三区| 精品久久人人做人人爰| 欧美精品在线观看一区二区| 99久久精品费精品国产一区二区| 精品在线观看视频| 日韩综合小视频| 亚洲一区影音先锋| 亚洲国产岛国毛片在线| 亚洲精品一区在线观看| 欧美日韩国产精品成人| 91国偷自产一区二区开放时间| 丁香天五香天堂综合| 国产在线视视频有精品| 免费高清在线视频一区·| 亚洲国产精品综合小说图片区| 中文字幕色av一区二区三区| 国产偷v国产偷v亚洲高清| 日韩欧美在线一区二区三区| 精品视频资源站| 在线日韩国产精品| 91日韩一区二区三区| 风流少妇一区二区| 国产精品一区二区三区乱码 | 91亚洲精华国产精华精华液| 国产老妇另类xxxxx| 久久国产欧美日韩精品| 日韩av高清在线观看| 午夜视频一区在线观看| 一二三四区精品视频| 一区二区高清视频在线观看| 亚洲免费高清视频在线| 亚洲精品水蜜桃| 亚洲久本草在线中文字幕| 亚洲欧美日韩国产另类专区| 成人午夜电影网站| 国产成人精品aa毛片|