導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

哈里伯頓公司的新式海上油氣工作船(英)

[加入收藏][字號: ] [時間:2009-02-05 Halliburton 關注度:0]
摘要:簡介:哈里伯頓公司推出新型海上工作船Stim Star Borneo,它是為在東南亞進行作業而設計的。它能進行各項增產措施,并能使用連續管進行修井作業。 Operators in Southeast Asia can now mo...
簡介:哈里伯頓公司推出新型海上工作船Stim Star Borneo,它是為在東南亞進行作業而設計的。它能進行各項增產措施,并能使用連續管進行修井作業。

Operators in Southeast Asia can now more readily implement Halliburton advanced stimulation and well intervention technologies. The new Stim Star Borneo vessel is a self propelled barge designed to work in the offshore oil and gas fields with the additional capability of servicing
wells in the rivers and deltas in Indonesia. 

The vessel is fully equipped to handle all phases of production stimulation including acidizing, acid fracturing, proppant fracturing, sand control and conformance treatments. In addition, the vessel is equipped to provide well intervention services using coiled tubing. 

Slickline and electric line capabilities can be readily added when required. 

At 200 ft length and 66 ft width, the Stim Star Borneo has an operating draft of 10.5 ft offshore and 9 ft in the delta areas. 

Above deck storage capacities consist of 5,200 gal acid, almost 4,400 gal additives and 350,000 lb proppant. 

Below deck capacities are almost 3,500 bbl of process and completion fluid and over 4,700 bbl of drill water. 

Maximum fracturing rate is 18 bbl/min with sand and 25 bbl/min with clean fluid.

Focused on Safety and Environmental Performance 

The Stim Star Borneo meets or exceeds the requirement of SOLAS and other regulatory bodies. In addition, the vessel is outfitted to provide environmentally sustainable operations. 

Advanced Technologies for Improved Well Performance 

The Stim Star Borneo serves as a platform that enables Halliburton specialists to reliably deliver key services. 

Reservoir Deliverability Solutions 

• Hydraulic fracturing
• Tight gas reservoir technologies
• Horizontal well fracturing
• Limited entry to bypass damage
• Near-wellbore damage removal
• Matrix acidizing
• Foamed acid
• Near-wellbore damage removal (cont’d)
• Scale removal (mechanical and chemical)
• Waterblock removal
• Horizontal well cleanup 

Conformance Solutions 

• Chemical water shut off
• Relative permeability modification 

Sand Control Solutions 

• New completions
• Fracpack
• High rate water pack
• Thru-tubing intervention
• Resin sand consolidation
• Thru-tubing gravel pack with coiled tubing 

Well Intervention Solutions – Coiled Tubing 

• Nitrogen services
• Fishing and milling
• Stimulation
• Sediment washing
• Logging 

InstaVis™ Mixing System 

The Stim Star Borneo is equipped with Halliburton’s proprietary InstaVis™ gel-on-the-fly system that uses a fully hydrated fracturing gel concentrate and provides important advantages: 

• Eliminates waiting for gel hydration.
• Enables almost instantaneous adjustments to help match fluid characteristics to formation parameters.
• Requires no waiting time to build additional fluid volume or change viscosity.
• Enables optimization of gel polymer loading during the treatment which can reduce the amount of polymer in the formation.

關鍵字: 修井船 哈里伯頓 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 m.1314163.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
主站蜘蛛池模板: 日本午夜精品一本在线观看| 久久精品国产亚洲AV无码麻豆 | 高级别墅贵妇交换俱乐部小说| 久热中文字幕在线精品免费| 黄色aaa级片| 黄色软件网站大全| 性色爽爱性色爽爱网站| 香瓜七兄弟第二季| 色噜噜在线视频| 神秘电影欧美草草影院麻豆第一页| 精品丝袜国产自在线拍亚洲| 男女男精品网站| 极品丝袜乱系列大全集目录| 日本护士xxxx爽爽爽| 免费在线观看污视频网站| 亚洲欧美一区二区三区图片| 亚洲av永久综合在线观看尤物| 久久国产乱子伦精品免费强| 一级做a爰片性色毛片刺激| 91香蕉视频直播| 老司机精品免费视频| 天天综合天天色| 色综合久久天天综合| youjizz亚洲| 亚洲国产激情在线一区| 金8国欧美系列在线| 香港三级欧美国产精品| 亚洲欧美一级视频| 亚洲小视频在线| 亚洲av无码一区二区三区鸳鸯影院| 亚洲五月丁香综合视频| 亚洲三级小视频| 久久免费精品一区二区| 久久久久久综合网天天| 中文字幕无码乱码人妻系列蜜桃| 久久久久久亚洲av成人无码国产| 久久天天躁狠狠躁夜夜| 久9re热这里精品首页| 东北女人毛多水多牲交视频| 一个人看的hd免费视频| 97精品人人妻人人|