摘要:簡介:從致密頁巖層采氣通常需要大量資金投資在泵上,并且成功的機率很低。貝克石油公司開發出裸眼壓裂完井系統以改變這種局面,它能簡化壓裂操作步驟,并將不盈利的項目轉化成盈利。 Producing gas from tight ...
簡介:從致密頁巖層采氣通常需要大量資金投資在泵上,并且成功的機率很低。貝克石油公司開發出裸眼壓裂完井系統以改變這種局面,它能簡化壓裂操作步驟,并將不盈利的項目轉化成盈利。



Producing gas from tight shale formations typically requires major pumping investments with little guarantee of success. Baker Oil Tools aims to change this scenario with its Frac-Point Open-Hole Fracture Completion System, designed to simplify the fracturing process and turn otherwise unprofitable projects into moneymakers. 

Fracturing a horizontal, tight-gas well traditionally was done by either pumping frac fluid into the open hole and hoping for the best or isolating multiple zones by repeatedly cementing, plugging, perforating, and fracturing, a process that includes multiple trips, pumping trucks on standby for days at a time, and the expense and risk of perforating. 

Frac-Point is designed to improve this process in several ways. The system eliminates the costly cycle of cementing, plugging, and perforating, and it enables up to eight fracture placements in one trip, with a high degree of accuracy, the company says. The operator gains greater control of the frac treatment and a greater chance of fracturing the entire length of the lateral and increasing production. 

The system consists of four primary components: 

• The liner top packer, a hydraulic set permanent production packer with a tieback sleeve designed to carry up to 200,000 lb of liner assembly
• A short radius open-hole packer, featuring a patented antiextrusion packing element system
• Frac sleeves, including appropriately sized ball seats. The sleeves are actuated open sequentially by deploying balls from the surface, and the balls and seats are designed to be milled up to allow for a full opening production inner diameter to be maintained throughout the system, if needed
• Pressure-actuated sleeves, which are similar to the frac sleeves but do not contain a ball seat. 

The components work in tandem to isolate intervals of a horizontal section and pinpoint fracture treatment placement. Because it is a one-trip system, fracture treatments for each section can be pumped on the same day, which eliminates having to mobilize and demobilize pumping equipment. 

A major challenge of completing high-angle wells in open hole is getting tools through doglegs and other restrictions to total depth. The system’s packers are shorter for navigation through tight spots, and the company’s torque and drag software estimates the probability of reaching total depth. 

To determine the economic feasibility of a project, the company’s reservoir analysis team models different completion scenarios and estimates well deliverability for specific well parameters. The process takes into account factors like reservoir size, temperature, pressure, permeability, fracture properties and projected gas prices.


關鍵字: baker frac completion 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 m.1314163.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
主站蜘蛛池模板: 一本色道无码道dvd在线观看| 国产白白白在线永久播放| 台湾佬中文娱乐在线| 久久精品国产亚洲av麻豆| 手机看片福利在线| 污视频网站观看| 岛国免费v片在线观看完整版| 欧美色图在线播放| 天啪天天久久天天综合啪| 再深点灬舒服灬太大| 中国陆超帅精瘦ktv直男少爷| 色哟哟网站在线观看| 无码中文人妻在线一区二区三区 | 国产真实乱freesex| 亚洲欧洲专线一区| 久久精品水蜜桃av综合天堂| 亚洲狠狠婷婷综合久久久久| 亚洲sss综合天堂久久久| 朋友把我玩成喷泉状| 波多野结衣教师中文字幕| 好妈妈5高清中字在线观看| 十八在线观观看免费视频| 一级做a爰全过程免费视频毛片| 老妇高潮潮喷到猛进猛出| 日韩亚洲av无码一区二区不卡| 国产无套露脸视频在线观看| 亚洲13又紧又嫩又水多| 免费福利视频导航| 男人的j桶女人的j视频| 天堂√最新版中文在线天堂 | 亚洲人成精品久久久久| h视频在线观看免费网站| 欧美亚洲国产片在线观看| 国产精品人成在线播放新网站| 亚洲第一区精品观看| 足恋玩丝袜脚视频免费网站| 欧美孕妇与黑人巨交| 国产成人综合在线观看网站| 久久精品国内一区二区三区| 草莓视频成人app下载| 搡女人免费视频大全|